Pre-Startup Safety Review(PSSR) Checklist

A Pre-Startup Safety Review(PSSR) checklist is a critical process to ensure that all safety measures, operational procedures, and equipment are correctly in place before starting up a new or modified process. Using tools like eAuditor Audits & Inspections, you can streamline and digitalize the PSSR process. Here’s a  structure for a PSSR Checklist in eAuditor Audits & Inspections.

Pre-Startup Safety Review(PSSR) Checklist

Pre-Startup Safety Review (PSSR) Checklist


1. General Information

  • Company Name:
  • Location:
  • Department:
  • Project Name/ID:
  • Date:
  • PSSR Leader/Inspector:
  • Review Team Members:

2. Equipment Readiness

  • Is all required equipment installed and checked?
    (Yes / No / N/A)
  • Are documents for the design and operational specifications available?
  • Has site equipment been inspected for defects or damage?
  • Are all protective devices and safety systems (e.g., pressure relief, alarms, interlocks) operational?
  • Is the equipment free from obstructions and are labels on equipment proper?

3. Process Documentation

  • Are current process flow diagrams (PFDs) and piping & instrumentation diagrams (P&IDs) available?
  • Does site update the operating procedure and does communication go out to relevant personnel?
  • Are emergency shutdown procedures in place with clear definition?
  • Are process limits and safe operating parameters in place with clear definition?

4. Personnel Safety

  • Does site provide trainings to all operators and personnel on the new process?
  • Is appropriate personal protective equipment (PPE) available?
  • Did site identify and mitigate hazards related to the process?
  • Are Safety Data Sheets (SDS) available for all chemicals in the process?
  • Are fire and safety equipment accessible, and in good condition?

5. Electrical and Instrumentation

  • Does site test all electrical systems and controls for functionality?
  • Are instrumentation loops tested and confirmed?
  • Is there proper grounding of equipment?
  • Are labeling on electrical panels proper?
  • Are critical alarms operational?

Pre-Startup Safety Review(PSSR) Checklist


6. Mechanical Integrity

  • Does site perform mechanical integrity complete inspection?
  • Are all pumps, motors, and valves functional?
  • Does site inspect and approve pressure vessels?
  • Are there inspections of pipelines for leaks and damages?
  • Are safety guards and barriers in place?

7. Environmental and Regulatory Compliance

  • Are environmental permits in place?
  • Are emissions or discharge limits complying with local regulations?
  • Is spill containment available?
  • Are waste disposal procedures in place?

8. Risk Assessment

  • Has a process hazard analysis (PHA) or hazard identification (HAZID) study been conducted?
  • Does site address all PHA action items?
  • Does site perform a Job Safety Analysis (JSA) or risk assessment?
  • Are identified safety-critical devices and components in place?

9. Testing and Validation

  • Does site conduct commissioning tests been successfully?
  • Does site complete performance tests to verify system functionality?
  • Has startup been simulated under safe conditions?
  • Does site obtain final approval from all stakeholders?

10. Final Review and Sign-Off

  • PSSR Team Leader Signature:
  • Date:
  • Operations Manager Signature:
  • Date:
  • Safety Officer Signature:
  • Date:

Additional Notes:

(Include any specific instructions, follow-ups, or observations here.)


Implementation in eAuditor Audits & Inspections

Pre-Startup Safety Review(PSSR) Checklist

To use this checklist in eAuditor Audits & Inspections, you can follow these steps:

  1. Create a New Template: In eAuditor Audits & Inspections, navigate to the “Templates” section and select “Create New Template.” or use existing Pre-Startup Safety Review(PSSR) Checklist Template.
  2. Set Up Sections: Organize Pre-Startup Safety Review(PSSR) Checklist into categories like “Equipment Readiness,” “Process Documentation,” etc.
  3. Add Questions: For each section, add the relevant checklist questions with options such as Yes/No/Not Applicable, and the ability to add comments and attachments.
  4. Assign Tasks: Assign specific actions or review tasks to team members.
  5. Automate Workflow: Set up automated workflows in eAuditor to ensure follow-up actions and sign-offs are completed after the checklist is filled out.

Pre-Startup Safety Review(PSSR) Checklist digital process will help streamline safety reviews, ensure compliance, and provide real-time reporting and tracking of PSSR activities.

 

 