Pre-Commissioning Checks
- Documentation and Manuals
- Verify that all documentation, including operation manuals, maintenance guides, and commissioning procedures, are available.
- Physical Inspection
- Inspect the chiller for any physical damage.
- Check for proper installation of the unit, ensuring it is level and securely anchored.
- Piping and Connections
- Verify that all piping connections (inlet, outlet, and refrigerant lines) are correctly installed and free of leaks.
- Ensure that all electrical connections are properly made and secured.
- Check that all insulation on refrigerant lines and chilled water pipes is intact.
- Electrical Checks
- Verify the correct power supply voltage and phase.
- Ensure all electrical connections are tight and that wiring is correct according to the wiring diagram.
- Check the proper operation of all safety and control devices (e.g., circuit breakers, overload relays).
- Refrigerant Levels
- Check the refrigerant charge and ensure it is within the manufacturer’s recommended levels.
Initial Start-Up Checks
- System Flush and Fill
- Flush the chilled water system to remove debris and contaminants.
- Fill the system with the appropriate mixture of water and glycol (if used).
- Pre-Start Inspections
- Verify that all valves (chilled water, condenser water, refrigerant) are in the correct positions for start-up.
- Ensure that the cooling tower (if applicable) and associated pumps are operational.
- Power On and Initial Test
- Energize the control circuit and verify that the chiller control panel powers up correctly.
- Check that the control panel displays and indicators are functioning.
- Lubrication
- Verify that all lubrication systems (e.g., oil pumps, oil heaters) are operational.
- Check oil levels and pressures, ensuring they are within the recommended ranges.
Operational Checks
- Compressor Operation
- Start the compressor and monitor for any unusual noises or vibrations.
- Check suction and discharge pressures and compare them to expected values.
- Temperature and Pressure Monitoring
- Verify the temperature and pressure readings at various points in the system (evaporator, condenser, etc.).
- Ensure that the temperature differential across the evaporator and condenser is within the manufacturer’s specifications.
- Flow Rates
- Check chilled water and condenser water flow rates and ensure they meet design specifications.
- Verify that the flow switches and sensors are operating correctly.
- Control System Verification
- Test the operation of the control system, including setpoints, alarms, and safety cutouts.
- Verify the operation of any remote monitoring systems or Building Management System (BMS) interfaces.
- Performance Testing
- Perform a load test to ensure the chiller can handle the expected cooling load.
- Monitor system performance over a period to ensure stability and reliability.
Post-Commissioning Checks
- Safety Checks
- Verify the operation of all safety devices, including high and low-pressure cutouts, oil pressure safety switches, and temperature sensors.
- Test emergency shutdown procedures.
- System Balancing
- Adjust and balance the system to ensure even distribution of cooling load.
- Check for and correct any hot spots or uneven cooling.
- Final Inspection and Documentation
- Perform a final inspection of the chiller and associated systems.
- Document all test results, settings, and any adjustments made during commissioning.
- Training and Handover
- Provide training to the operations and maintenance personnel on the proper operation and maintenance of the chiller.
- Handover all commissioning documentation, including test reports, manuals, and as-built drawings.
Chiller commissioning checks Checklist Template
Pre-Commissioning Checks
- Documentation and manuals are available
- Physical inspection for damage
- Proper installation verification
- Correct piping and connection checks
- Electrical checks
- Refrigerant levels checked
Initial Start-Up Checks
- System flush and fill
- Pre-start inspections
- Control panel power-up verification
- Lubrication systems operational
Operational Checks
- Compressor operation check
- Temperature and pressure monitoring
- Flow rates verification
- Control system testing
- Performance testing
Post-Commissioning Checks
- Safety checks
- System balancing
- Final inspection and documentation
- Training and handover
Implementing Chiller commissioning checks and Using the eAuditor Audits & Inspection
- Create Checklists
- Use the eAuditor Audits & Inspection’s form builder to create the Chiller commissioning checks checklists based on the templates above.
- Organize the Chiller commissioning checks checklists into modules for easy navigation.
- Assign Tasks
- Assign specific tasks to team members.
- Set deadlines and reminders for each task.
- Collect Data
- Team members can input data directly into the app during the commissioning process.
- Use photo uploads for visual confirmation of completed tasks.
- Collect signatures for accountability.
- Review and Approve
- Supervisors can review the completed checklists.
- Approve or request further action based on the data collected.
- Generate Reports
- Generate comprehensive reports from the collected data.
- Export reports in PDF or Excel format for record-keeping and handover.
- Continuous Monitoring
- Use the eAuditor Audits & Inspection for ongoing monitoring and maintenance checks post-commissioning.
- Update checklists and procedures as needed based on feedback and operational data.
Example of eAuditor Audits & Inspection Setup
Using eAuditor
- Create Template
- Open eAuditor and create a new Chiller commissioning checks template.
- Add sections for Pre-Commissioning, Initial Start-Up, Operational, and Post-Commissioning Checks.
- Add Items
- For each section, add items with interactive elements like checkboxes, text fields, and photo uploads.
- Assign and Schedule
- Assign the template to relevant team members.
- Schedule inspections and set reminders.
- Data Collection
- Team members complete the checklist in the eAuditor Audits & Inspection, uploading photos and notes as needed.
- Sign off on completed tasks.
- Review and Export
- Review the completed checklists in the eAuditor Audits & Inspection.
- Export the results to PDF or other formats for documentation.