Chiller Commissioning Checks

Pre-Commissioning Checks

  1. Documentation and Manuals
    • Verify that all documentation, including operation manuals, maintenance guides, and commissioning procedures, are available.
  2. Physical Inspection
    • Inspect the chiller for any physical damage.
    • Check for proper installation of the unit, ensuring it is level and securely anchored.
  3. Piping and Connections
    • Verify that all piping connections (inlet, outlet, and refrigerant lines) are correctly installed and free of leaks.
    • Ensure that all electrical connections are properly made and secured.
    • Check that all insulation on refrigerant lines and chilled water pipes is intact.
  4. Electrical Checks
    • Verify the correct power supply voltage and phase.
    • Ensure all electrical connections are tight and that wiring is correct according to the wiring diagram.
    • Check the proper operation of all safety and control devices (e.g., circuit breakers, overload relays).
  5. Refrigerant Levels
    • Check the refrigerant charge and ensure it is within the manufacturer’s recommended levels.

Initial Start-Up Checks

  1. System Flush and Fill
    • Flush the chilled water system to remove debris and contaminants.
    • Fill the system with the appropriate mixture of water and glycol (if used).
  2. Pre-Start Inspections
    • Verify that all valves (chilled water, condenser water, refrigerant) are in the correct positions for start-up.
    • Ensure that the cooling tower (if applicable) and associated pumps are operational.
  3. Power On and Initial Test
    • Energize the control circuit and verify that the chiller control panel powers up correctly.
    • Check that the control panel displays and indicators are functioning.
  4. Lubrication
    • Verify that all lubrication systems (e.g., oil pumps, oil heaters) are operational.
    • Check oil levels and pressures, ensuring they are within the recommended ranges.

Operational Checks

  1. Compressor Operation
    • Start the compressor and monitor for any unusual noises or vibrations.
    • Check suction and discharge pressures and compare them to expected values.
  2. Temperature and Pressure Monitoring
    • Verify the temperature and pressure readings at various points in the system (evaporator, condenser, etc.).
    • Ensure that the temperature differential across the evaporator and condenser is within the manufacturer’s specifications.
  3. Flow Rates
    • Check chilled water and condenser water flow rates and ensure they meet design specifications.
    • Verify that the flow switches and sensors are operating correctly.
  4. Control System Verification
    • Test the operation of the control system, including setpoints, alarms, and safety cutouts.
    • Verify the operation of any remote monitoring systems or Building Management System (BMS) interfaces.
  5. Performance Testing
    • Perform a load test to ensure the chiller can handle the expected cooling load.
    • Monitor system performance over a period to ensure stability and reliability.

Post-Commissioning Checks

  1. Safety Checks
    • Verify the operation of all safety devices, including high and low-pressure cutouts, oil pressure safety switches, and temperature sensors.
    • Test emergency shutdown procedures.
  2. System Balancing
    • Adjust and balance the system to ensure even distribution of cooling load.
    • Check for and correct any hot spots or uneven cooling.
  3. Final Inspection and Documentation
    • Perform a final inspection of the chiller and associated systems.
    • Document all test results, settings, and any adjustments made during commissioning.
  4. Training and Handover
    • Provide training to the operations and maintenance personnel on the proper operation and maintenance of the chiller.
    • Handover all commissioning documentation, including test reports, manuals, and as-built drawings.

Chiller commissioning checks Checklist Template

Pre-Commissioning Checks

  • Documentation and manuals are available
  • Physical inspection for damage
  • Proper installation verification
  • Correct piping and connection checks
  • Electrical checks
  • Refrigerant levels checked

Initial Start-Up Checks

  • System flush and fill
  • Pre-start inspections
  • Control panel power-up verification
  • Lubrication systems operational

Operational Checks

  • Compressor operation check
  • Temperature and pressure monitoring
  • Flow rates verification
  • Control system testing
  • Performance testing

Post-Commissioning Checks

  • Safety checks
  • System balancing
  • Final inspection and documentation
  • Training and handover

 

Chiller Commissioning Checks

 

Implementing Chiller commissioning checks and Using the eAuditor Audits & Inspection

  1. Create Checklists
    • Use the eAuditor Audits & Inspection’s form builder to create the Chiller commissioning checks checklists based on the templates above.
    • Organize the Chiller commissioning checks checklists into modules for easy navigation.
  2. Assign Tasks
    • Assign specific tasks to team members.
    • Set deadlines and reminders for each task.
  3. Collect Data
    • Team members can input data directly into the app during the commissioning process.
    • Use photo uploads for visual confirmation of completed tasks.
    • Collect signatures for accountability.
  4. Review and Approve
    • Supervisors can review the completed checklists.
    • Approve or request further action based on the data collected.
  5. Generate Reports
    • Generate comprehensive reports from the collected data.
    • Export reports in PDF or Excel format for record-keeping and handover.
  6. Continuous Monitoring
    • Use the eAuditor Audits & Inspection for ongoing monitoring and maintenance checks post-commissioning.
    • Update checklists and procedures as needed based on feedback and operational data.

Example of eAuditor Audits & Inspection Setup

Chiller Commissioning Checks

Using eAuditor

  1. Create Template
    • Open eAuditor and create a new Chiller commissioning checks template.
    • Add sections for Pre-Commissioning, Initial Start-Up, Operational, and Post-Commissioning Checks.
  2. Add Items
    • For each section, add items with interactive elements like checkboxes, text fields, and photo uploads.
  3. Assign and Schedule
    • Assign the template to relevant team members.
    • Schedule inspections and set reminders.
  4. Data Collection
    • Team members complete the checklist in the eAuditor Audits & Inspection, uploading photos and notes as needed.
    • Sign off on completed tasks.
  5. Review and Export
    • Review the completed checklists in the eAuditor Audits & Inspection.
    • Export the results to PDF or other formats for documentation.

 