Electrical Risk Assessment Checklist

Creating an Electrical Risk Assessment Checklist using eAuditor Audits & Inspections ensures comprehensive safety checks during electrical inspections and risk assessments.

This helps identify hazards, mitigate risks, and ensure compliance with safety regulations such as OSHA, NFPA 70E, or other local standards.

Below is a step-by-step guide on how to develop a Electrical Risk Assessment Checklist using eAuditor Audits & Inspections:

Electrical Risk Assessment Checklist

Key Sections of an Electrical Risk Assessment Checklist:

  1. General Information

    • Site name/location.
    • Inspector name.
    • Date and time of inspection.
    • Weather conditions (if outdoors).
    • Work area description.
  2. Preliminary Risk Identification

    • Is the electrical equipment properly labeled and identified?
    • Are electrical diagrams and plans available?
    • Are there any reports of previous electrical hazards or incidents in this area?
    • Has the work area been clearly marked for authorized personnel only?
  3. Electrical System Inspection

    • Circuit Breakers and Switchgear:
      • Are circuit breakers labeled and functional?
      • Has switchgear compartments locked to prevent unauthorized access?
      • Are all grounding and bonding connections intact?
    • Cabling and Wiring:
      • Check for frayed, exposed, or damaged wires.
      • Are cables properly routed and secured?
      • Are extension cords being used appropriately (no daisy chaining)?
      • Verify the absence of overheating, sparks, or burns on cables.
    • Panels and Control Boxes:
      • Are electrical panels free of obstructions?
      • Is the panel door securely closed?
      • Are all covers and labels in place?
    • Lighting and Power Outlets:
      • Are all power outlets functional and properly grounded?
      • Are there visible signs of damage to lighting fixtures?
      • Has Ground Fault Circuit Interrupters (GFCIs) installed in wet areas?
  4. Personal Protective Equipment (PPE)

    • Is appropriate PPE being used for electrical work (e.g., insulated gloves, face shields)?
    • Is the PPE in good condition and regularly inspected?
    • Are personnel trained in PPE use for electrical hazards?
  5. Risk Control Measures

    • Lockout/Tagout (LOTO):
      • Is there a Lockout/Tagout procedure in place?
      • Has the LOTO system been properly implemented for electrical repairs or maintenance?
      • Are authorized personnel trained in LOTO procedures?
    • Signage and Warnings:
      • Are warning signs and labels (e.g., high voltage, electrical hazard) clearly visible?
      • Are emergency shutdown procedures posted?
    • Fire Protection:
      • Are fire extinguishers accessible and appropriate for electrical fires?
      • Is there an emergency response plan in place for electrical incidents?
  6. Workplace Environment

    • Is the electrical work area dry and clean to reduce the risk of electric shock?
    • Are tools and equipment used in electrical work insulated and well-maintained?
    • Is there adequate lighting for electrical work?
    • Are there any combustible materials near electrical installations?
  7. Worker Training and Competency

    • Have workers received electrical safety training?
    • Are there records of electrical safety certifications or qualifications?
    • Are workers familiar with site-specific electrical hazards?
  8. Testing and Monitoring

    • Are residual-current devices (RCDs) or Ground Fault Circuit Interrupters (GFCIs) regularly tested?
    • Is thermal imaging used to detect hot spots in electrical equipment?
    • Are insulation resistance tests conducted on cables and equipment?
    • Are electrical meters and tools properly calibrated?
  9. Emergency Procedures

    • Are emergency procedures in place for electrical shocks or arc flash incidents?
    • Is there an eyewash station or first aid kit near the electrical work area?
    • Are workers trained to respond to electrical emergencies, including CPR for electric shock?
  10. Corrective Actions

    • Record any identified electrical hazards.
    • Assign corrective actions for each hazard (e.g., repair wiring, replace PPE, update LOTO procedures).
    • Set deadlines and responsible persons for corrective actions.
  11. Completion and Sign-Off

    • Final assessment of overall electrical safety at the site.
    • Inspector signature and date.
    • Manager or supervisor review and sign-off. Electrical Risk Assessment Checklist

Additional Features Using eAuditor Audits & Inspections with Electrical Risk Assessment Checklist:

Electrical Risk Assessment Checklist

  • Photo and Video Documentation:
    • Use eAuditor Audits & Inspection to take photos or videos of any issues for clarity and documentation.
  • Auto-Generated Reports:
    • Automatically generate detailed reports post-inspection to share with stakeholders and management.
  • Real-Time Analytics and Monitoring:
    • Use eAuditor Audits & Inspection’s analytics feature to monitor trends over time and spot recurring electrical hazards.
  • Schedule Recurring Inspections:
    • Set up reminders for routine inspections, ensuring ongoing compliance and hazard monitoring.

This structured approach to electrical risk assessment through eAuditor Audits & Inspection helps organizations stay compliant, reduce hazards, and maintain electrical safety standards in their work environments.

 

 