Construction Punch List Template
A Construction Punch List Template in eAuditor Audits & Inspections will help ensure that all incomplete or defective work on a construction project is thoroughly identified, tracked, and resolved before final project completion. This template can be customized in eAuditor to include dynamic features such as task assignments, photos, and notes. Below is a detailed template you can use to create your punch list in eAuditor Audits & Inspections:
Construction Punch List Template
1. General Information
- Project Name: ____________
- Project Address: ____________
- Date of Inspection: ____________
- Inspector’s Name: ____________
- Contractor/Subcontractor: ____________
- Project Manager: ____________
- Expected Completion Date: ____________
- Weather Conditions: ____________
- Additional Notes: ____________
2. Punch List Items
For each punch list item, the following details can be included:
- Location/Area: [ ] Exterior [ ] Interior [ ] Roof [ ] Ground Floor [ ] Upper Floor [ ] Basement [ ] Other
- Issue/Deficiency: ____________
- Responsible Party: [ ] Contractor [ ] Subcontractor [ ] Supplier [ ] Other
- Priority: [ ] High [ ] Medium [ ] Low
- Date Identified: ____________
- Due Date for Completion: ____________
- Comments/Description of Issue: ____________
- Attached Photos: [Upload photos of the issue]
- Status: [ ] Pending [ ] In Progress [ ] Completed
- Verified By: ____________
- Date Resolved: ____________
3. External Work Inspection
3.1. Site/Exterior
- Landscaping complete: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Driveways and walkways installed: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Site cleanup complete: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Exterior cladding and finishes: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Gutters and downspouts installed: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4. Interior Work Inspection
4.1. Flooring
- Flooring installed and level: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Flooring free from defects (cracks, gaps, etc.): [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.2. Walls & Ceilings
- Wall finishes (paint, plaster, wallpaper): [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Ceilings free from cracks or damage: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.3. Doors & Windows
- Doors installed and functioning: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Windows open/close correctly: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.4. Cabinets & Millwork
- Cabinets installed correctly: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Millwork (trim, molding, etc.) finished: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.5. Plumbing
- Fixtures installed (sinks, toilets, showers): [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Plumbing connections tested and free from leaks: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.6. Electrical
- Light switches and outlets installed and functional: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Smoke detectors installed and working: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
4.7. HVAC
- Heating, ventilation, and cooling systems installed: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Thermostats functional: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
5. Safety & Compliance
5.1. Safety Checks
- Fire safety systems in place (extinguishers, sprinklers, alarms): [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Handrails installed on stairs: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
5.2. Compliance Documentation
- Certificates of compliance obtained: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
- Local authority inspections complete: [ ] Yes [ ] No [ ] N/A
- Comments: ____________
6. Final Comments and Sign-off
- Additional Comments: ____________
- Inspector’s Signature: ____________
- Date: ____________
- Contractor’s Signature: ____________
- Date: ____________
Key Features for eAuditor Audits & Inspections
- Photos: For each punch list item, enable photo upload for documenting the issue.
- Task Assignment: Add the ability to assign each punch list item to relevant contractors or team members.
- Priority Settings: Include priority fields (High, Medium, Low) to help manage critical items first.
- Completion Tracking: Use status fields (Pending, In Progress, Completed) for easy tracking.
- Due Dates: Allow for setting due dates for each task for timely resolution.
- Digital Sign-off: Use digital signatures for final approval and sign-off.
How to Use in eAuditor Audits & Inspections
- Template Creation: Input the template into eAuditor Audits & Inspection’s template editor, separating items by location (external, internal) or trade (plumbing, electrical, etc.).
- Task Assignment: Assign punch list items to specific team members, subcontractors, or contractors within eAuditor Audits & Inspections.
- Real-time Tracking: Use eAuditor Audits & Inspections to monitor progress, track issues, and generate reports for stakeholders.
- Reports: After completing the inspection, use eAuditor Audits & Inspections to generate a detailed report with all punch list items, attached photos, and signatures.
This punch list template ensures all items are tracked and addressed before project completion, allowing for smooth handover and minimizing post-construction issues.