Footing and Foundation Checklist

Planning and Pre-Construction

  1. Soil Investigation:
    • Conduct soil tests to determine load-bearing capacity.
    • Obtain geotechnical report.
  2. Design Review:
    • Verify footing and foundation design with structural drawings.
    • Ensure design complies with local building codes and standards.
  3. Permits and Approvals:
    • Secure all necessary permits and approvals from local authorities.

Site Preparation

  1. Clearing and Grubbing:
    • Remove vegetation, debris, and topsoil.
    • Mark out the area for footings and foundations.
  2. Excavation:
    • Excavate to the required depth and dimensions as per the design.
    • Ensure proper slope and benching for safety.
  3. Compaction:
    • Compact the bottom of the excavation to prevent settlement.
  4. Temporary Supports:
    • Install temporary supports or shoring if necessary for safety.

Footing Construction

  1. Formwork:
    • Set up formwork according to design dimensions.
    • Ensure formwork is stable and properly braced.
  2. Reinforcement:
    • Place rebar as per structural drawings.
    • Check rebar size, spacing, and overlaps.
    • Use spacers and chairs to maintain cover.
  3. Inspection:
    • Schedule inspection by a qualified engineer or inspector before pouring concrete.
  4. Concrete Pouring:
    • Use appropriate concrete mix design.
    • Ensure proper placement and compaction of concrete.
    • Vibrate concrete to eliminate air pockets.
  5. Curing:
    • Apply curing methods (e.g., water curing, curing compounds) to prevent premature drying.

Foundation Construction

  1. Formwork:
    • Install formwork for foundation walls or slabs.
    • Ensure formwork is correctly aligned and braced.
  2. Reinforcement:
    • Place reinforcement as per design.
    • Verify rebar size, spacing, and anchorage.
  3. Plumbing and Utilities:
    • Install necessary plumbing and utility lines before pouring concrete.
    • Ensure proper sealing and protection of pipes and conduits.
  4. Concrete Pouring:
    • Use appropriate concrete mix.
    • Ensure even distribution and compaction.
    • Avoid cold joints by pouring continuously.
  5. Curing:
    • Implement curing process for foundation concrete.
  6. Waterproofing:
    • Apply waterproofing membrane or coating to foundation walls.
    • Ensure proper sealing of joints and penetrations.

Post-Construction

  1. Backfilling:
    • Backfill with suitable material and compact in layers.
    • Ensure proper drainage away from the foundation.
  2. Drainage:
    • Install foundation drainage system (e.g., French drains).
    • Verify that water drains away from the foundation.
  3. Inspection and Documentation:
    • Conduct final inspection to ensure all aspects are compliant.
    • Document all inspections, tests, and certifications.
  4. Cleanup:
    • Remove formwork and clean the site.
    • Dispose of waste material properly.

Safety and Compliance

  1. Safety Measures:
    • Ensure all workers wear appropriate PPE.
    • Implement safety protocols for excavation, concrete work, and lifting.
  2. Compliance:
    • Verify that all work complies with building codes, regulations, and design specifications.

Pre-Construction Phase

  1. Soil Investigation:
    • Upload geotechnical report.
    • Confirm soil tests and load-bearing capacity results.
  2. Design Review:
    • Upload structural drawings.
    • Verify design compliance with local codes.
  3. Permits and Approvals:
    • Upload permits and approvals.
    • Verify all necessary documentation is in place.

Site Preparation

  1. Clearing and Grubbing:
    • Attach photos of cleared site.
    • Confirm removal of vegetation and debris.
  2. Excavation:
    • Record excavation depth and dimensions.
    • Attach photos of excavation.
  3. Compaction:
    • Log compaction equipment used.
    • Confirm compaction tests and results.
  4. Temporary Supports:
    • Attach photos of temporary supports/shoring.

Footing Construction

  1. Formwork Setup:
    • Attach photos of formwork.
    • Confirm dimensions and bracing.
  2. Reinforcement Placement:
    • Attach photos of rebar layout.
    • Confirm rebar size, spacing, and overlaps.
  3. Pre-Pour Inspection:
    • Schedule and log inspection.
    • Attach inspector’s approval.
  4. Concrete Pouring:
    • Log concrete mix details.
    • Attach photos during pouring process.
  5. Curing Process:
    • Log curing method used.
    • Attach photos during curing.

Foundation Construction

  1. Foundation Formwork:
    • Attach photos of foundation formwork.
    • Confirm alignment and bracing.
  2. Reinforcement:
    • Attach photos of reinforcement.
    • Verify compliance with design.
  3. Plumbing and Utilities:
    • Attach photos of installed utilities.
    • Confirm proper sealing.
  4. Concrete Pouring:
    • Log concrete mix details.
    • Attach photos during pouring.
  5. Curing Process:
    • Log curing method.
    • Attach photos during curing.
  6. Waterproofing:
    • Attach photos of waterproofing application.
    • Confirm sealing of joints and penetrations.

Post-Construction

  1. Backfilling:
    • Attach photos of backfilling.
    • Log material and compaction details.
  2. Drainage Installation:
    • Attach photos of drainage system.
    • Confirm functionality.
  3. Final Inspection:
    • Schedule and log final inspection.
    • Attach inspector’s approval and notes.
  4. Cleanup:
    • Attach photos of cleaned site.
    • Log disposal of waste material.

Safety and Compliance

  1. Safety Measures:
    • Log PPE used by workers.
    • Attach photos of safety measures in place.
  2. Compliance Checks:
    • Attach photos and notes from compliance checks.
    • Verify adherence to codes and regulations.

Features of a eAuditor Audits & Inspections for Construction Checklists

Footing and Foundation Checklist

  • Photo Upload: Capture and upload photos at each stage.
  • Geo-Tagging: Record the location of each inspection.
  • Timestamping: Automatically timestamp entries for accurate record-keeping.
  • Signature Capture: Allow inspectors and workers to sign off on completed tasks.
  • Notifications: Set reminders for upcoming inspections and tasks.
  • Offline Mode: Access and update the checklist even without internet connectivity.
  • Reporting: Generate detailed reports for review and documentation.