Footing and Foundation Checklist
Performing Footing and Foundation using eAuditor Audits & Inspection.
Planning and Pre-Construction
- Soil Investigation:
- Conduct soil tests to determine load-bearing capacity.
- Obtain geotechnical report.
- Design Review:
- Verify footing and foundation design with structural drawings.
- Ensure design complies with local building codes and standards.
- Permits and Approvals:
- Secure all necessary permits and approvals from local authorities.
Site Preparation
- Clearing and Grubbing:
- Remove vegetation, debris, and topsoil.
- Mark out the area for footings and foundations.
- Excavation:
- Excavate to the required depth and dimensions as per the design.
- Ensure proper slope and benching for safety.
- Compaction:
- Compact the bottom of the excavation to prevent settlement.
- Temporary Supports:
- Install temporary supports or shoring if necessary for safety.
Footing Construction
- Formwork:
- Set up formwork according to design dimensions.
- Ensure formwork is stable and properly braced.
- Reinforcement:
- Place rebar as per structural drawings.
- Check rebar size, spacing, and overlaps.
- Use spacers and chairs to maintain cover.
- Inspection:
- Schedule inspection by a qualified engineer or inspector before pouring concrete.
- Concrete Pouring:
- Use appropriate concrete mix design.
- Ensure proper placement and compaction of concrete.
- Vibrate concrete to eliminate air pockets.
- Curing:
- Apply curing methods (e.g., water curing, curing compounds) to prevent premature drying.
Foundation Construction
- Formwork:
- Install formwork for foundation walls or slabs.
- Ensure formwork is correctly aligned and braced.
- Reinforcement:
- Place reinforcement as per design.
- Verify rebar size, spacing, and anchorage.
- Plumbing and Utilities:
- Install necessary plumbing and utility lines before pouring concrete.
- Ensure proper sealing and protection of pipes and conduits.
- Concrete Pouring:
- Use appropriate concrete mix.
- Ensure even distribution and compaction.
- Avoid cold joints by pouring continuously.
- Curing:
- Implement curing process for foundation concrete.
- Waterproofing:
- Apply waterproofing membrane or coating to foundation walls.
- Ensure proper sealing of joints and penetrations.
Post-Construction
- Backfilling:
- Backfill with suitable material and compact in layers.
- Ensure proper drainage away from the foundation.
- Drainage:
- Install foundation drainage system (e.g., French drains).
- Verify that water drains away from the foundation.
- Inspection and Documentation:
- Conduct final inspection to ensure all aspects are compliant.
- Document all inspections, tests, and certifications.
- Cleanup:
- Remove formwork and clean the site.
- Dispose of waste material properly.
Safety and Compliance
- Safety Measures:
- Ensure all workers wear appropriate PPE.
- Implement safety protocols for excavation, concrete work, and lifting.
- Compliance:
- Verify that all work complies with building codes, regulations, and design specifications.
Pre-Construction Phase
- Soil Investigation:
- Upload geotechnical report.
- Confirm soil tests and load-bearing capacity results.
- Design Review:
- Upload structural drawings.
- Verify design compliance with local codes.
- Permits and Approvals:
- Upload permits and approvals.
- Verify all necessary documentation is in place.
Site Preparation
- Clearing and Grubbing:
- Attach photos of cleared site.
- Confirm removal of vegetation and debris.
- Excavation:
- Record excavation depth and dimensions.
- Attach photos of excavation.
- Compaction:
- Log compaction equipment used.
- Confirm compaction tests and results.
- Temporary Supports:
- Attach photos of temporary supports/shoring.
Footing Construction
- Formwork Setup:
- Attach photos of formwork.
- Confirm dimensions and bracing.
- Reinforcement Placement:
- Attach photos of rebar layout.
- Confirm rebar size, spacing, and overlaps.
- Pre-Pour Inspection:
- Schedule and log inspection.
- Attach inspector’s approval.
- Concrete Pouring:
- Log concrete mix details.
- Attach photos during pouring process.
- Curing Process:
- Log curing method used.
- Attach photos during curing.
Foundation Construction
- Foundation Formwork:
- Attach photos of foundation formwork.
- Confirm alignment and bracing.
- Reinforcement:
- Attach photos of reinforcement.
- Verify compliance with design.
- Plumbing and Utilities:
- Attach photos of installed utilities.
- Confirm proper sealing.
- Concrete Pouring:
- Log concrete mix details.
- Attach photos during pouring.
- Curing Process:
- Log curing method.
- Attach photos during curing.
- Waterproofing:
- Attach photos of waterproofing application.
- Confirm sealing of joints and penetrations.
Post-Construction
- Backfilling:
- Attach photos of backfilling.
- Log material and compaction details.
- Drainage Installation:
- Attach photos of drainage system.
- Confirm functionality.
- Final Inspection:
- Schedule and log final inspection.
- Attach inspector’s approval and notes.
- Cleanup:
- Attach photos of cleaned site.
- Log disposal of waste material.
Safety and Compliance
- Safety Measures:
- Log PPE used by workers.
- Attach photos of safety measures in place.
- Compliance Checks:
- Attach photos and notes from compliance checks.
- Verify adherence to codes and regulations.
Features of a eAuditor Audits & Inspections for Construction Checklists
- Photo Upload: Capture and upload photos at each stage.
- Geo-Tagging: Record the location of each inspection.
- Timestamping: Automatically timestamp entries for accurate record-keeping.
- Signature Capture: Allow inspectors and workers to sign off on completed tasks.
- Notifications: Set reminders for upcoming inspections and tasks.
- Offline Mode: Access and update the checklist even without internet connectivity.
- Reporting: Generate detailed reports for review and documentation.
- Collaboration: Allow multiple users to access and update the checklist in real-time.