NGA Last Step fibre Scoping Form V2 Using eAuditor
The NGA Last Step fibre Scoping Form V2 helps you plan and assess fibre installation at the final stage. It ensures that the route, equipment, and site conditions meet project needs. You can use eAuditor to record details, capture photos, and keep clear scoping records.
1. Open the App
Open eAuditor on your phone or tablet.
2. Create the Template
- Go to Templates
- Tap Create Template
- Choose Blank Template
3. Add Sections
Basic Information
Add fields for:
- Project name
- Site location
- Date
- Surveyor name
NGA Last Step fibre Scoping Form V2 – Site Details
Record site information:
- Site address is correct
- Access to the site is available
- Permissions are confirmed
NGA Last Step fibre Scoping Form V2 – Route Assessment
Check the fibre route:
- Entry and exit points are clear
- Pathway is safe and accessible
- No major obstacles appear
NGA Last Step fibre Scoping Form V2 – Infrastructure Check
Inspect existing infrastructure:
- Ducts and poles are available
- Chambers are accessible
- No damage appears
Equipment Requirements
List required tools and materials:
- Fibre cables
- Connectors and joints
- Installation tools
NGA Last Step Form V2 – Risk Assessment
Identify risks:
- Traffic or public safety risks
- Environmental hazards
- Access limitations
Photos
Add photos in eAuditor to record the site, route, and equipment.
Comments
Write notes about issues, constraints, or special requirements.
Signatures
Collect the surveyor’s signature to confirm the form.
4. Complete the NGA Last Step Form V2
Open the template in eAuditor during the site survey.
Record all details and observations.
5. Save the Record
Tap Complete Inspection
Export the report as a PDF
Save the file as a scoping record
✅ This NGA Last Step fibre Scoping Form V2 helps you plan fibre installation clearly and avoid delays during execution. 📡📋