eAuditor Audits & Inspections

A Practical Guide to APQP Documents Using eAuditor Audits & Inspections

APQP Documents – For Quality Professionals, Engineers, and Project Leads Who Want to Get It Right the First Time


Launching a new product in manufacturing without a solid plan is like building a house without a blueprintโ€”youโ€™ll end up fixing problems that shouldโ€™ve been prevented. Thatโ€™s where APQP (Advanced Product Quality Planning) steps in. It creates a structured framework to help teams deliver quality products, on time, with fewer surprises.

But letโ€™s be honestโ€”APQP documents can feel overwhelming. Spreadsheets get messy, tasks get lost in email threads, and audits turn into scavenger hunts. Thatโ€™s why more teams are turning to eAuditor Audits & Inspections to manage APQP planning with clarity, accountability, and confidence.

This guide walks you through how to use eAuditor to manage APQP planning documentsโ€”from design to launchโ€”along with real examples and field-tested insights.


ย ย ย APQP Documents Using eAuditor ()What Is APQP and Why It Matters

APQP (Advanced Product Quality Planning) is a framework developed by the automotive industry to ensure products meet customer expectations from day one. Itโ€™s broken down into five phases:

  1. Plan and Define

  2. Product Design and Development

  3. Process Design and Development

  4. Product and Process Validation

  5. Feedback, Assessment, and Corrective Action

Each phase has key APQP documentsโ€”like DFMEAs, process flows, control plans, and PPAP packagesโ€”that track risk, verify compliance, and support continuous improvement.

A quality engineer at a Tier 1 supplier once told us:
“We knew how to do good work. But with APQP in eAuditor, we learned how to show it. And thatโ€™s what makes customers trust us.”


APQP Documents Using eAuditor ()

Using eAuditor to Manage APQP Documents

eAuditor isnโ€™t just a checklist tool. Itโ€™s a flexible platform that turns complex planning into structured, auditable workflows. Hereโ€™s how to use it for each APQP phase:


1. Phase 1: Plan and Define Program

Goal: Understand customer needs and project scope.

Documents:

  • Customer Requirements Checklist

  • Feasibility Study

  • Risk Analysis (Preliminary)

  • Program Timeline

How to Use eAuditor:

  • Create a custom inspection template to verify customer specs against internal capabilities.

  • Add checklist items for kickoff meeting attendance, risk flags, and feasibility sign-offs.

  • Attach customer documents directly to the audit entry.

  • Set automated reminders for timeline reviews.

Pro Tip: One project manager at an injection molding company used eAuditor to document cross-functional feasibility reviews. They caught a tooling mismatch before the first design drawing, saving $12,000 in revisions.


2.

APQP Documents Using eAuditor ()

Phase 2: Product Design and Development

Goal: Build a design that meets customer and regulatory expectations.

Documents:

  • Design FMEA (DFMEA)

  • Design Verification Plan

  • Engineering Drawings

  • Design Reviews

How to Use eAuditor:

  • Assign each DFMEA line item as an auditable step.

  • Use logic fields to escalate risks with RPN (Risk Priority Number) scoring.

  • Add file upload fields for drawing revisions and calculation checks.

Real Example: An automotive supplier used eAuditor to link DFMEA reviews to drawing versions. When a supplier flagged a potential design clash, the team resolved it within hoursโ€”because everyone had the right version in one place.


3. Phase 3: Process Design and Development

Goal: Define how youโ€™ll make the product consistently and safely.

Documents:

  • Process Flow Diagram

  • Process FMEA (PFMEA)

  • Control Plan

  • Equipment and Tooling Requirements

How to Use eAuditor:

  • Build a checklist with each process step and associated controls.

  • Assign PFMEA actions to specific owners with due dates and photos of tooling.

  • Cross-link the control plan with process flow steps using a shared identifier.

Anecdote: A plant lead in Ohio shared that before eAuditor, their PFMEAs lived in spreadsheets nobody opened after the first review. Now, each shift logs process deviations directly into the PFMEA checklistโ€”with real-time alerts for high-priority items.


4.

APQP Documents Using eAuditor ()

Phase 4: Product and Process Validation

Goal: Prove that the product and process meet requirements under real conditions.

Documents:

  • Production Part Approval Process (PPAP)

  • Capability Studies (Cp, Cpk)

  • Measurement System Analysis (MSA)

  • Initial Run Reports

How to Use eAuditor:

  • Create a PPAP approval form with checkboxes for each element (dimensional results, material certs, Gage R&R, etc.)

  • Upload test results and validation data

  • Include sign-off fields for quality, engineering, and customer approval

Smart Feature: eAuditorโ€™s โ€œevidence captureโ€ lets you take photos of first-run parts and attach capability graphsโ€”all within the checklist.


5. Phase 5: Feedback, Assessment, and Corrective Action

Goal: Learn from what happenedโ€”and get better.

Documents:

  • Customer Complaints Log

  • Warranty Data

  • 8D Problem Solving Reports

  • Continuous Improvement Plans

How to Use eAuditor:

  • Convert complaints into inspection checklists with built-in 8D workflows.

  • Assign root cause analysis steps (5 Whys, Fishbone) to team members.

  • Track resolution timelines and verify corrective action effectiveness over time.

Case Study: A casting manufacturer used eAuditor to track corrective actions across five plants. Within six months, they reduced repeat defects by 43%โ€”simply by making follow-up part of the audit process.


Benefits of Managing APQP with eAuditor

  • Better Visibility โ€“ Track who did what, when, and with what evidence.

  • Faster Reviews โ€“ Standardized templates save hours on audits and customer reviews.

  • Real-Time Collaboration โ€“ Multiple departments can work in the same template.

  • Built-In Compliance โ€“ Stay audit-ready for IATF 16949, ISO 9001, or customer-specific requirements.

One launch engineer put it simply:
“We stopped reacting and started anticipating. Thatโ€™s what good APQP doesโ€”and eAuditor makes it stick.”


Final Thoughts

APQP isnโ€™t about paperwork. Itโ€™s about building trustโ€”trust between teams, with your customers, and in your own process. When you manage planning APQP documents with eAuditor, you gain more than traceabilityโ€”you gain control, consistency, and clarity.

So whether you’re launching a simple bracket or a complex assembly, start with a good planโ€”and audit it every step of the way.


Leave a Reply

Your email address will not be published. Required fields are marked *