Perform Data Center Assessment using eAuditor
A Data Center Assessment is a comprehensive evaluation of a data centerโs physical infrastructure, environmental controls, power systems, network connectivity, and operational practices to ensure reliability, security, and business continuity. Performing a Data Center Assessment using eAuditor enables organizations to systematically identify risks, verify compliance with standards, and maintain high availability of critical IT services.
-
Purpose and Scope of Data Center Assessment
The Data Center Assessment examines whether the facility and its supporting systems are designed, operated, and maintained to meet organizational, regulatory, and industry requirements.
1.1 Objectives
- Ensure operational resilience and uptime
- Identify infrastructure, environmental, and security risks
- Validate compliance with data center standards and policies
- Improve efficiency, safety, and reliability
- Support disaster recovery and business continuity planning
1.2 Areas Covered
- Physical facility and building structure
- Power supply and electrical systems
- Cooling and environmental controls
- Network and cabling infrastructure
- Physical and logical security controls
- Operations, monitoring, and maintenance
-
Preparing the Data Center Assessment in eAuditor
2.1 Assessment Template Configuration
Create a structured Data Center Assessment checklist in eAuditor with sections such as:
- Facility and location details
- Power and electrical infrastructure
- Cooling and environmental systems
- Network and equipment layout
- Security and access controls
- Operational procedures and documentation
Checklist setup should include:
- Yes / No / Not Applicable responses
- Mandatory comments for non-compliance
- Photo and document uploads for evidence
- Automated action creation for failed items
2.2 Standards and Best Practice Alignment
Align the Data Center Assessment with:
- Uptime Institute Tier Standards
- ISO/IEC 27001 and ISO/IEC 22301
- TIA-942 data center standards
- Internal IT and facilities policies
-
Facility and Structural Assessment
3.1 Site and Building Review
During the Data Center Assessment, verify:
- Location risk factors (flood, seismic, fire)
- Structural integrity of the building
- Raised flooring and load capacity
- Fire-rated walls and ceilings
3.2 Fire Detection and Suppression
- Smoke and heat detection systems installed
- Fire suppression systems appropriate for IT environments
- Regular testing and maintenance records available
-
Power and Electrical Infrastructure Review
4.1 Power Supply and Redundancy
The Data Center Assessment should confirm:
- Redundant utility power feeds
- Uninterruptible Power Supply (UPS) capacity and health
- Backup generators are tested and maintained
- Automatic transfer switches are functioning
4.2 Electrical Distribution
- Power Distribution Units (PDUs) are labeled and monitored
- Load balancing across circuits
- Grounding and earthing compliance

-
Cooling and Environmental Controls
5.1 Cooling Systems
Audit items should verify:
- Adequate cooling capacity for current and future loads
- Redundant cooling units in place
- Hot aisle / cold aisle containment implemented
5.2 Environmental Monitoring
- Temperature and humidity sensors installed
- Real-time monitoring and alerts configured
- Preventive maintenance schedules followed
-
Network and Equipment Infrastructure
6.1 Rack and Equipment Layout
The Data Center Assessment should assess:
- Rack stability and proper anchoring
- Clear labeling of equipment and cabling
- Adequate spacing for airflow and maintenance
6.2 Cabling and Connectivity
- Structured cabling standards followed
- Separation of power and data cables
- Redundant network paths implemented
-
Physical and Logical Security Controls
7.1 Physical Security
Verify during the Data Center Assessment:
- Controlled access to data center areas
- Biometric or card-based entry systems
- CCTV coverage and monitoring
- Visitor access logging and supervision
7.2 Logical and Operational Security
- Secure configuration of management interfaces
- Access control for monitoring and management systems
- Change management procedures enforced
-
Operations, Monitoring, and Maintenance
8.1 Operational Procedures
The Data Center Assessment should confirm:
- Documented standard operating procedures
- Incident and escalation processes defined
- Preventive maintenance plans are in place
8.2 Monitoring and Alerting
- Centralized monitoring for power, cooling, and systems
- Alert thresholds defined and tested
- Incident logs reviewed and retained

-
Risk Identification, Evidence, and Action Management
9.1 Risk Assessment
- Identify single points of failure
- Assess impact and likelihood of failures
- Assign risk ratings using eAuditor
9.2 Evidence and Corrective Actions
- Capture photos, diagrams, and documents
- Auto-generate corrective actions
- Assign owners, priorities, and deadlines
- Track remediation progress to closure
-
Reporting and Continuous Improvement
10.1 Data Center Assessment Reporting
Generate Data Center Assessment reports showing:
- Overall compliance and readiness scores
- Key risks and infrastructure gaps
- Corrective action status and accountability
10.2 Continuous Improvement
- Analyze trends across assessments
- Improve resilience and efficiency over time
- Support audits, certifications, and management reviews
Final Summary
Conducting a Data Center Assessment using eAuditor provides a structured and repeatable method to evaluate data center facilities, infrastructure, and operations. This approach enhances visibility of risks, supports compliance with recognized standards, improves reliability and availability, and ensures corrective actions are tracked and verified, ultimately strengthening the organizationโs ability to deliver resilient and secure IT services.