Here’s a detailed checklist template that can be used for post construction cleaning. It’s designed to be imported into eAuditor Audits & Inspections for easy tracking, inspection, and reporting:
Check for and clean any paint spills on exterior surfaces
[Yes/No]
[Enter comments]
Dispose of construction waste safely
[Yes/No]
[Enter comments]
3. Interior Cleaning
3.1 Living Areas, Bedrooms & Hallways
Task
Completed
Comments
Remove dust from walls and ceilings
[Yes/No]
[Enter comments]
Vacuum and mop floors (hard surfaces)
[Yes/No]
[Enter comments]
Clean carpets (if applicable)
[Yes/No]
[Enter comments]
Clean baseboards, door frames, and moldings
[Yes/No]
[Enter comments]
Wipe and polish light switches, fixtures, and outlets
[Yes/No]
[Enter comments]
Clean windows, including frames, tracks, and sills
[Yes/No]
[Enter comments]
3.2 Kitchen
Task
Completed
Comments
Clean countertops and backsplashes
[Yes/No]
[Enter comments]
Clean cabinets (inside and out)
[Yes/No]
[Enter comments]
Clean and disinfect sinks and faucets
[Yes/No]
[Enter comments]
Clean floors and remove any stains
[Yes/No]
[Enter comments]
Clean appliances (interior and exterior)
[Yes/No]
[Enter comments]
3.3 Bathrooms
Task
Completed
Comments
Clean mirrors, shower doors, and glass surfaces
[Yes/No]
[Enter comments]
Clean bathtubs, sinks, toilets, and faucets
[Yes/No]
[Enter comments]
Wipe down tiles and grout
[Yes/No]
[Enter comments]
Clean and polish bathroom fixtures
[Yes/No]
[Enter comments]
Remove dust from exhaust fans
[Yes/No]
[Enter comments]
3.4 Utility Rooms & Closets
Task
Completed
Comments
Wipe down shelves and closet rods
[Yes/No]
[Enter comments]
Clean floors and vacuum carpeted areas
[Yes/No]
[Enter comments]
Remove dust from vents and air filters
[Yes/No]
[Enter comments]
4. Final Inspection
Task
Completed
Comments
Verify all rooms have been cleaned to specification
[Yes/No]
[Enter comments]
Ensure removal of all tools, cleaning equipment
[Yes/No]
[Enter comments]
Conduct a walkthrough with the project manager/client
[Yes/No]
[Enter comments]
Ensure no construction dust is left on surfaces
[Yes/No]
[Enter comments]
5. Additional Notes
[Additional observations or issues encountered during cleaning]
6. Sign-Off
Name
Signature
Date
Cleaning Crew Leader
[Signature]
[Date]
Project Manager
[Signature]
[Date]
Client
[Signature]
[Date]
Attachments
Photos of cleaned areas: [Attach photos]
Any additional documentation: [Attach documents]
7. Audit Summary
Summary of Key Findings:
[Enter findings here]
This template allows thorough documentation and tracking of post-construction cleaning tasks using eAuditor Audits & Inspections. It can be modified based on specific project needs and further customized with additional fields for your specific requirements.
Get Started For Free Perform Footing and Foundation Inspection using eAuditor Footing and Foundation are essential structural elements that form the base […]
Get Started For Free Perform Construction Standard Operating Procedure Assessment using eAuditor A Construction Standard Operating Procedure (SOP) is a formal, step-by-step […]