Solar Site Survey Checklist
Creating a Solar Site Survey Checklist using eAuditor Audits & Inspections helps ensure that all critical aspects of a solar installation project are considered during the site assessment. Here’s how you can set up a comprehensive Solar Site Survey Checklist:
1.
Sign Up and Set Up
eAuditor Audits & Inspections
- Download the eAuditor Audits & Inspections app or access it via a web browser.
- Sign up for an account or log in if you already have one.
2.
Create a New Template or Use Existing Template
- Go to the “Templates†section.
- Click on “Create Template†or “+ New Template.â€
- Name your checklist (e.g., “Solar Site Survey Checklistâ€).
3.
Organize the Checklist by Key Sections
Break down the survey into key sections that cover all necessary details. Typical sections include:
-
Site Information
-
Structural Assessment
-
Electrical Assessment
-
Shading Analysis
-
Roof Assessment
-
Environmental and Safety Considerations
-
Documentation and Photos
4.
Add Specific Items to Each Section
Site Information
-
Client Name
Record the name of the client.
-
Site Address
Note the address of the installation site.
-
Date of Survey
Record the date of the survey.
-
Surveyor Name
Record the name of the person conducting the survey.
-
Weather Conditions
Note weather conditions (e.g., sunny, cloudy, rainy).
Structural Assessment
-
Roof Material
Identify the type of roof (e.g., asphalt shingles, metal, tile).
-
Roof Age and Condition
Assess the age and overall condition of the roof.
-
Structural Integrity
Evaluate the structure for any signs of damage or weakness.
-
Roof Slope and Orientation
Record the slope (pitch) and compass orientation (azimuth) of the roof.
-
Available Roof Space
Measure and record available space for panels.
Electrical Assessment
-
Main Service Panel Location
Identify the location of the main electrical service panel.
-
Panel Capacity
Note the capacity of the service panel (e.g., 200A).
-
Spare Breakers Available
Check for available breaker slots in the panel.
-
Distance from Inverter Location to Main Panel
Measure and record the distance.
-
Existing Electrical Equipment
List any existing equipment that might affect the installation.
Shading Analysis
-
Obstructions
Identify any obstructions (e.g., trees, chimneys, nearby buildings).
-
Shading Analysis Tool Used
Record the tool used for shading analysis (e.g., Solar Pathfinder, Solmetric SunEye).
-
Solar Window
Evaluate the solar window for each proposed array location.
-
Annual Sunlight Exposure
Estimate the annual sunlight exposure (e.g., full sun, partial shade).
Roof Assessment
-
Roof Access Points
Identify safe access points to the roof.
-
Roof Load Capacity
Assess the load-bearing capacity of the roof.
-
Roof Penetrations
Note any existing roof penetrations and potential new ones.
-
Water Drainage
Evaluate water drainage patterns to ensure they won’t affect the installation.
-
Attic Space Inspection
Inspect the attic space for additional structural assessment.
Environmental and Safety Considerations
-
Wind Load Consideration
Assess the site for wind load factors.
-
Seismic Considerations
Evaluate seismic considerations based on the location.
-
Fire Code Compliance
Ensure the installation complies with local fire codes.
-
Safety Hazards
Identify any potential safety hazards (e.g., power lines, hazardous materials).
Documentation and Photos
-
Site Photos
Take and attach photos of the site, including roof conditions, shading obstructions, and the main service panel.
-
Site Sketch
Create a site sketch showing proposed panel locations, electrical routing, and shading obstructions.
-
Permits and Zoning
Record any permits or zoning requirements.
-
Notes and Observations
Add any additional notes or observations relevant to the installation.
5.
Set Up Reminders and Assign Tasks
- Use eAuditor Audits & Inspections’s scheduling feature to set reminders for when the survey needs to be conducted.
- Assign specific sections of the checklist to different team members if necessary.
6.
Conduct the Survey
- As you perform the survey, use the checklist to ensure all areas are covered.
- Mark each item as complete or incomplete.
- Use eAuditor Audits & Inspections’s note and photo functions to document conditions in detail.
7.
Review and Finalize
- Review the completed checklist for accuracy.
- Make any necessary adjustments or add notes for follow-up actions.
8.
Export and Share Reports
- Export the completed checklist as a PDF or other format.
- Share the report with stakeholders, such as clients, installation teams, or project managers.
9.
Backup and Store
- Save the checklist in eAuditor Audits & Inspections’s cloud storage for future reference.
- Organize your checklists and reports by client or project name for easy retrieval.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to print (Opens in new window) Print
- Click to email a link to a friend (Opens in new window) Email
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on Threads (Opens in new window) Threads
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to share on Nextdoor (Opens in new window) Nextdoor