Substation Commissioning Checklist

Using eAuditor Audits & Inspections  for substation commissioning is a great way to streamline inspections, ensure thoroughness, and maintain documentation. Below is a general substation commissioning checklist that can be used with eAuditor Audits & Inspections. It includes a wide range of items typically checked during the commissioning process.


Substation Commissioning Checklist

1. General Information

  • Site Name/Location:
  • Commissioning Date:
  • Commissioning Engineer(s):
  • Weather Conditions:
  • Substation Voltage Level:
  • Type of Substation: (AIS/GIS)
  • Main Contractor:
  • Subcontractor(s):

2. Pre-Commissioning Checks

  • Site Access:
    • Ensure clear access to the site for equipment and personnel.
    • Verify access control and safety measures in place.
  • Documentation:
    • Verify as-built drawings are complete and available.
    • Equipment manuals and manufacturer instructions on site.
    • Safety documentation and risk assessments reviewed.
  • Environmental Checks:
    • Ensure proper grounding of all substation equipment.
    • Check the drainage system and flood prevention measures.
    • Check for environmental protections (oil containment, chemical handling).

3. Health, Safety, and Security

  • PPE available and in use (hard hats, gloves, safety glasses, etc.).
  • Verify all personnel are trained in emergency protocols.
  • First-aid kits and emergency contact numbers on site.
  • Fire extinguishers are accessible and functional.
  • Warning signage properly posted (high-voltage, arc flash, etc.).
  • Security systems (CCTV, fencing) operational.

4. Transformer Testing

  • Transformer Type: (Oil/ Dry-type / Gas-insulated)
  • Pre-Energization Testing:
    • Insulation resistance (megger test).
    • Transformer turns ratio (TTR) test.
    • Sweep frequency response analysis (SFRA).
    • Oil sampling and testing (if applicable).
    • Power factor/dissipation factor test.
    • Neutral grounding resistances tested.
  • Protection Systems:
    • Check Buchholz relay function.
    • Confirm OLTC (on-load tap changer) operation and control.
    • Verify protection relay settings as per the design.
    • Test the functionality of cooling systems (fans, pumps, oil circulation).

5. Circuit Breakers

  • Pre-Energization Testing:
    • Insulation resistance test.
    • Circuit breaker timing test.
    • Contact resistance measurement.
    • Functional operation test (open/close command).
    • Check SF6 pressure level (for gas-insulated breakers).
    • Gas leak detection (if applicable).
    • Verify auxiliary contacts.
  • Operational Checks:
    • Trip and close mechanism functional.
    • Spring charging motor and hydraulic system operational.
    • Confirm correct relay tripping action.

6. Switchgear

  • Visual inspection for damage or defects.
  • Insulation resistance tests.
  • Circuit isolation tested.
  • Operational testing (manual and remote controls).
  • Earthing system verification.
  • Phase verification (polarity checks).
  • Confirm interlocking system works as designed.

7. Protection Systems

  • Protection Relay Testing:
    • Overcurrent relay tested.
    • Differential relay tested.
    • Distance protection tested.
    • Backup protection functional.
    • Verify relay communication to SCADA/DCS systems.
  • Alarm Systems:
    • Audible and visual alarms tested.
    • SCADA alarm verification.
    • Backup power supplies tested for alarms.

8. Control and Instrumentation

  • Verify SCADA/DCS connectivity.
  • Confirm all communication cables are properly terminated.
  • Ensure correct time synchronization between substation devices.
  • Voltage, current, and power metering accuracy.
  • Verify CTs (current transformers) and PTs (potential transformers) are correctly installed and connected.
  • Signal checks from field devices (voltage/current transducers, temperature sensors, etc.).

Substation Commissioning Checklist

9. Grounding System

  • Visual inspection of grounding system.
  • Grounding system resistance test (earth resistance).
  • Verify connection to ground grid.
  • Confirm grounding connections to all equipment.
  • Test continuity of grounding system.

10. Battery and Auxiliary Power Systems

  • Battery bank installation inspection.
  • Verify automatic changeover to backup power.
  • Battery voltage and current measurement.
  • Battery load test.
  • Test charger function and alarms.

11. Busbar and Insulators

  • Insulation resistance test of busbars.
  • Visual inspection of busbars and insulators.
  • Confirm correct phase identification and connections.
  • Check for proper clearance from other equipment.

12. Cables and Wiring

  • Cable Testing:
    • Cable megger testing.
    • High-potential (Hi-Pot) test.
    • Cable sheath testing.
  • Cable Installation:
    • Verify correct routing and labeling.
    • Terminations and joints properly executed.
    • Adequate cable supports and fixings installed.

13. Lightning Arresters

  • Visual inspection of lightning arresters.
  • Verify the installation and grounding.
  • Measure insulation resistance of the lightning arresters.

14. Final Energization Checks

  • Confirm final relay settings.
  • Pre-energization checks completed and signed off.
  • Final review of all test results.
  • Approval from all stakeholders for energization.

15. Post-Energization Tests

  • Voltage and load checks under operational conditions.
  • Monitor for unusual noises, overheating, or abnormal behavior.
  • Test automatic voltage regulation system.
  • Monitoring of equipment behavior for the first 24 hours post-energization.

16. Sign-Off

  • Inspection Completed By:
    • Name/Signature:
    • Date:
  • Reviewed By (Supervisor):
    • Name/Signature:
    • Date:
  • Client Representative Approval:
    • Name/Signature:
    • Date:

How to Use Substation Commissioning Checklist in eAuditor Audits & Inspections:

Substation Commissioning Checklist

  1. Create or use existing Substation Commissioning Checklist: Create a new template in eAuditor Audits & Inspections and use existing Substation Commissioning Checklist or build the checklist.
  2. Customize Fields: Adjust any fields to meet the specific requirements of the substation project, adding or removing tests based on equipment.
  3. Set up Automation: Use eAuditor Audits & Inspection’s automation tools to set reminders for key inspections or follow-ups during and after the commissioning.
  4. Add Photos & Comments: Use eAuditor Audits & Inspection’s feature to attach images, comments, and evidence of inspections for each section.
  5. Generate Reports: After completing the checklist, generate and share reports instantly with the team.

By utilizing eAuditor Audits & Inspections for substation commissioning, you can ensure that all key tasks are performed, documented, and communicated efficiently.

 