Vibration
Vibration
Construction Site Risk Assessment Checklist
A Construction Site Risk Assessmentย Checklist for eAuditor Audits & Inspections helps ensure safety and compliance by identifying potential hazards and implementing control measures. Below is a comprehensive checklist that you can implement in eAuditor Audits & Inspectionsย to perform thorough risk assessments on construction sites.

Construction Site Risk Assessment Checklist
1. General Information
- Site Name:
- Location:
- Date:
- Assessor Name:
- Weather Conditions:
- Site Supervisor:
- Number of Workers on Site:
2. Site Setup & Access
- Site Boundaries & Fencing:
- Adequate fencing and barriers in place
- Signage posted to warn of hazards
- No unauthorized access to the site
- Emergency Exits:
- โ Clearly marked emergency exits
- โ Exits free of obstructions
- Site Access & Egress:
- Safe access and egress points
- Designated areas for vehicle entry and exit
- ย Pedestrian walkways clearly marked
3. Personal Protective Equipment (PPE)
- PPE Availability:
- Hard hats available and worn
- ย High-visibility vests worn
- ย Safety boots and gloves worn as required
- PPE Condition:
- โ All PPE is in good condition
- โ Workers trained on the proper use of PPE
- Face Protection:
- โ Eye and face protection available (goggles, masks, etc.)
- โ Respirators used where required (dust, fumes)
4. Working at Heights
- Fall Protection:
- Guardrails, barriers, or fall arrest systems in place
- Ladders are secure and in good condition
- ย Workers trained in working at heights
- Scaffolding:
- Scaffolding erected and inspected by a qualified person
- ย Toe boards and mid-rails installed on scaffolding
- ย No visible damage or defects in scaffolding components
- Roof Work:
- ย Safety nets or harnesses used for roof work
- Access to roof work is safe and controlled
5. Excavations and Trenches
- Excavation Safety:
- Trenches shored, benched, or sloped to prevent collapse
- ย Excavations inspected daily before work begins
- Barriers around excavations to prevent falls
- Underground Services:
- โ Utilities (gas, water, electricity) located and marked
- โ Safe digging practices followed (hand digging near services)
- Access and Egress:
- โ Safe access (ladders, ramps) provided for deep trenches
- โ No water accumulation in excavation sites
6. Manual Handling
- Lifting Hazards:
- ย Workers trained in manual handling techniques
- ย Mechanical aids available (hoists, forklifts, etc.)
- No evidence of workers lifting loads beyond safe limits
- Workstation Ergonomics:
- โ Work areas designed to minimize manual handling risks
- โ Regular breaks taken to avoid strain injuries
7. Plant, Machinery, and Equipment
- Machinery Maintenance:
- โ Equipment regularly inspected and maintained
- โ Maintenance records up-to-date and available
- Operator Training:
- โ Operators trained and certified for machinery use
- โ Operator instructions clearly posted
- Machinery Guards:
- โ Machine guards installed and functional
- โ Emergency stop mechanisms in place
- Powered Hand Tools:
- ย Tools in good condition and appropriate for the task
- ย Workers trained in the use of power tools
- ย No frayed or damaged electrical cords
8. Electrical Safety
- Electrical Installations:
- โ Temporary electrical installations inspected and certified
- โ No exposed wiring or damaged outlets
- Lockout/Tagout Procedures:
- โ Proper lockout/tagout procedures followed during maintenance
- โ All energy sources properly isolated before work
- Grounding and Bonding:
- โ Electrical systems grounded correctly
- โ Equipment properly bonded to prevent static discharge
9. Fire Safety
- Fire Extinguishers:
- โ Fire extinguishers located at key points around the site
- โ Extinguishers are in good condition and fully charged
- Flammable Materials:
- โ Flammable materials stored in designated areas
- โ No smoking zones clearly marked around flammable substances
- Emergency Evacuation Plan:
- โ Evacuation plan in place and communicated to workers
- โ Regular fire drills conducted
- Hot Work Permits:
- โ Hot work permits obtained for welding, cutting, etc.
- โ Fire watch maintained during and after hot work activities
10. Hazardous Substances
- Chemical Handling:
- Safety Data Sheets (SDS) available for all chemicals on site
- ย Workers trained in the safe use of hazardous substances
- Proper storage of chemicals (ventilated areas, secure containers)
- Spill Control:
- โ Spill containment kits available on-site
- โ Proper procedures for handling chemical spills in place
11. Vibration and Noiseย
- Noise Levels:
- Noise assessments conducted in high-noise areas
- Hearing protection available and worn in noisy areas
- ย Noise exposure limits not exceeded during work hours
- Vibration Hazards:
- โ Vibration control measures in place for vibrating tools
- โ Regular tool maintenance to minimize vibration exposure
12. Welfare Facilities
- Sanitary Facilities:
- โ Adequate toilets provided for workers
- โ Handwashing stations with clean water available
- Rest Areas:
- โ Designated rest areas for workers
- โ Drinking water provided and accessible
- First Aid Facilities:
- โ First aid kits fully stocked and accessible
- โ Trained first-aid personnel available on-site
13. Housekeeping
- Site Cleanliness:
- ย Walkways clear of debris and materials
- Proper waste disposal methods in place
- โ Tools and materials stored safely when not in use
- Slip, Trip, and Fall Hazards:
- โ No loose cables or uneven surfaces
- โ Spills cleaned up immediately
14. Environmental Considerations
- Dust Control:
- โ Dust suppression measures in place (water, covers)
- โ Workers using dust masks where necessary
- Noise Pollution:
- โ Noise impact on surrounding areas minimized
- โ Work schedules adjusted to limit noise at sensitive times
- Waste Management:
- โ Waste segregated and disposed of correctly
- โ Recycling measures in place on site
15. Risk Assessment & Action Plan
- Identified Hazards:
- โ List all hazards identified during the inspection
- Risk Level (Low, Medium, High):
- โ Assign a risk level to each hazard
- Control Measures:
- โ List control measures to mitigate risks
- Persons Responsible:
- โ Assign responsibility for implementing controls
- Completion Date:
- โ Specify deadlines for hazard correction
16. Sign-Off
- Inspector Signature:
- Site Supervisor Signature:
This checklist covers most key areas for assessing risks on construction sites. eAuditor Audits & Inspectionsย can be used to add fields for photos, signatures, severity ratings, and automatic risk calculations to make the inspection process more interactive and detailed.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to print (Opens in new window) Print
- Click to email a link to a friend (Opens in new window) Email
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on Threads (Opens in new window) Threads
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to share on Nextdoor (Opens in new window) Nextdoor