Residential Drywall Checklist
Creating a Residential Drywall Checklist in eAuditor Audits & Inspection helps ensure that drywall installation and finishing meet the required quality standards. Below is a guide on how to create and use a Residential Drywall Checklist in eAuditor Audits & Inspection:
1. Access eAuditor Audits & Inspection:
- Open the eAuditor Audits & Inspection app on your device.
- Log in with your credentials.
2. Create a New Template:
- Go to “Templates” in the eAuditor Audits & Inspection app.
- Click on “Create Template” or “New Template” to start building your checklist from scratch.
3. Design the Residential Drywall Checklist:
- Title the Checklist: Name your checklist something like “Residential Drywall Installation and Finishing Checklist.”
- Sections: Divide the checklist into sections that correspond to different stages or aspects of the drywall process.
4. Add Checklist Items:
- For each section, add specific checklist items. Here are some examples:
Section 1: Pre-Installation Inspection
- Drywall Sheets: Are the drywall sheets free from damage (cracks, dents, moisture)?
- Materials and Tools: Are all required materials (drywall screws, joint compound, tape) and tools available?
- Wall Framing: Has the wall framing been inspected for proper alignment, spacing, and stability?
- Electrical and Plumbing: Has all electrical and plumbing work been completed and inspected before drywall installation?
Section 2: Drywall Installation
- Cutting and Fitting: Are drywall sheets cut accurately to fit around openings (windows, doors) and corners?
- Fastening: Are drywall sheets fastened securely with screws at the correct intervals (typically every 12-16 inches)?
- Seams and Joints: Are seams and joints tight with no gaps?
- Corner Beads: Have metal corner beads been installed correctly on external corners?
Section 3: Taping and Mudding
- Joint Tape: Has joint tape been applied correctly over all seams and joints?
- First Coat: Is the first coat of joint compound smooth and even?
- Subsequent Coats: Have additional coats been applied after the first coat dries, with each layer sanded smooth?
- Corners and Edges: Are corners and edges neatly finished with no visible seams?
Section 4: Finishing
- Final Sanding: Has the final sanding been completed, with no visible ridges or imperfections?
- Primer Application: Has a coat of primer been applied to all surfaces?
- Surface Inspection: Is the surface smooth and ready for paint or wallpaper?
- Cleanup: Has all debris and dust from sanding been cleaned up?
Section 5: Final Inspection
- Overall Quality: Does the overall drywall installation meet quality standards (no visible seams, smooth finish)?
- Customer Satisfaction: Is the customer satisfied with the drywall installation?
- Punch List: Are there any items that need rework or attention before project completion?
5. Set Up Responses and Logic:
- For each checklist item, set up response types (Yes/No, Pass/Fail, N/A).
- You can also add conditional logic to trigger follow-up questions or actions if an item fails.
6. Add Notes and Attachments:
- Allow space for notes or comments under each checklist item.
- Include the option to attach photos or videos as evidence for each checklist item.
7. Assign and Share the Checklist:
- Once your template is complete, save it and assign it to relevant team members.
- You can share the template with your team or export it for use in your inspections.
8. Use the Checklist in Inspections:
- During drywall installation, use the checklist to ensure all tasks are completed to standard.
- Complete the checklist on your device, making sure to check off items, add notes, and attach any relevant photos.
9. Review and Export the Completed Checklist:
- After completing the inspection, review the checklist to ensure all items have been addressed.
- Export the completed checklist as a PDF or share it directly with your team or client.
10. Continuous Improvement:
- Regularly review and update the checklist template based on feedback and experiences to ensure it remains relevant and effective.