New Build Snagging List
New Build Snagging List in eAuditor Audits & Inspections helps identify issues that need to be addressed before the project is considered complete. Here’s a comprehensive snagging checklist for you to use, which can be customized in eAuditor Audits & Inspections for easy tracking and reporting.
1. General Information
- Property Address
- Date of Inspection
- Inspector’s Name
- Developer/Contractor
- Job Reference Number
2. Exterior Snagging
2.1. Roof
- Tiles/slates/shingles: Check for missing, cracked, or misaligned roofing materials.
- Gutters and downspouts: Ensure secure attaching with no blockages or leaks.
- Roof flashing: Verify correct installation and sealing of flashing around chimneys, vents, and skylights.
- Fascia and soffits: Inspect for damage, proper installation, and paint finishes.
2.2. Walls & Brickwork
- Brickwork: Ensure brick/stone pointing is clean, consistent, and free from cracks.
- Rendering: Check for smoothness, cracks, or any uneven finishes.
- External paintwork: Inspect for any peeling, cracks, or incomplete areas.
- Damp proof course (DPC): Confirm installation and visibility of DCP above ground level.
2.3. Windows & Doors (Exterior)
- Windows: Check for cracks, scratches, or misaligned glazing. Verify seals and locks are functional.
- External doors: Ensure doors open and close smoothly, with proper seals and alignment.
- Paint/finish: Inspect for proper finish on window frames, doors, and surrounds.
- Thresholds: Ensure external door thresholds are even and properly sealed.
2.4. Driveways, Paths, and Landscaping
- Paving: Verify that paths, patios, and driveways are level, secure, and free from cracks.
- Drains and gullies: Check for installation of external drains and they should be clear of debris.
- Fencing and gates: Inspect for stability, damage, and proper installation.
- Grass/turfing: Check for completion of landscaping and free from bare patches.
3. Interior Snagging
3.1. Walls & Ceilings
- Paintwork: Inspect for uneven coverage, peeling, or paint splashes on fixtures.
- Plaster: Ensure smoothness of walls and ceilings, with no cracks, bumps, or uneven finishes.
- Corners and joints: Check that corners are smooth and joints are filled properly.
- Drywall screws/nails: Look for any visible nail pops or screw marks.
3.2. Floors
- Flooring (carpet, tile, wood, laminate): Check for level installation, no gaps, damage, or uneven surfaces.
- Grouting: Ensure tiles are properly grouted with no cracks or gaps.
- Skirting boards: Verify they are securely attached and free from gaps or poorly finished corners.
3.3. Doors & Windows (Interior)
- Internal doors: Ensure doors are correctly aligned, open and close without sticking, and have no scratches or dents.
- Door handles and locks: Check all handles and locks function smoothly without resistance.
- Windows: Verify they open and close properly, with no sticking, and check for scratches on glass.
- Window latches and seals: Ensure windows are properly sealed and latches work correctly.
3.4. Electrical Systems
- Light switches: Ensure switches work correctly and are aligned with the wall.
- Sockets: Check all sockets for function and ensure they are installed level with the wall.
- Light fittings: Verify that all light fixtures are securely installed and bulbs are functioning.
- Smoke detectors: Ensure smoke detectors are installed and functional.
- External lights: Verify outdoor lighting is functional and properly positioned.
3.5. Plumbing Systems
- Taps: Ensure all taps are working, with no leaks or drips.
- Toilets: Verify toilets flush correctly and are securely fixed, with no leaks.
- Sinks and basins: Ensure sinks are sealed properly, with no leaks or drainage issues.
- Bath/shower: Check for leaks, ensure water pressure is adequate, and inspect seals around the bath or shower.
- Radiators/heating: Verify radiators are heating properly, with no leaks or cold spots.
3.6. Kitchen & Utility
- Cabinets and drawers: Check alignment, ensure doors and drawers open smoothly, and that handles are securely attached.
- Countertops: Verify countertops are level, properly sealed, and free from scratches or damage.
- Appliances: Ensure built-in appliances (oven, stove, dishwasher, etc.) are installed correctly and functional.
- Plumbing: Check under-sink plumbing for leaks and correct installation.
- Tiling and backsplash: Inspect for proper grout, tile alignment, and finishing around edges.
3.7. Bathrooms
- Tiles: Inspect for cracked or uneven tiles, ensure grouting is complete and consistent.
- Mirrors and cabinets: Ensure mirrors are securely installed, and cabinets function properly.
- Shower doors: Verify shower doors open and close smoothly and are properly sealed to prevent leaks.
- Towel rails and accessories: Check that all bathroom accessories are securely mounted.
3.8. Stairs and Balustrades
- Handrails: Ensure handrails are secure, without any wobbling.
- Steps: Check for level treads and ensure no creaking or loose steps.
- Balustrades: Verify balustrades are securely fixed and correctly spaced according to building regulations.
4. Heating and Ventilation
- Thermostats: Ensure thermostats function correctly and control the heating system as expected.
- Radiators: Check that radiators are heating properly, with no cold spots or leaks.
- Air vents: Ensure all ventilation grilles are installed and functioning.
- Extractor fans (kitchen and bathrooms): Verify extractor fans are working properly and are free from dust or obstructions.
5. Loft & Attic
- Insulation: Ensure the attic is properly insulated, with no gaps or uneven installation.
- Access hatch: Verify the hatch is secure, properly sealed, and easy to open/close.
- Ventilation: Ensure adequate ventilation to prevent condensation or dampness.
- Joists and beams: Check for any visible damage to joists or beams.
6. Final Checks
- Cleanliness: Ensure all rooms are free from debris, dust, and construction materials.
- Snagging completion: Mark each resolved snag as complete.
- Additional notes: Provide any additional observations or areas that require further attention.
7. Photo Documentation
- Take photos of any identified issues for documentation and tracking.
- Provide before/after photos when snags are resolved.
8. Sign-Off
- Inspector’s signature
- Developer’s signature (if applicable)
- Homeowner’s signature (if applicable)
- Date of sign-off
Customization in eAuditor Audits & Inspections
In eAuditor Audits & Inspections, you can customize this checklist by adding fields for:
- Dropdown menus for specific room types or issue categories.
- Photo uploads for each snag item.
- Action assignments to ensure issues are assigned to the correct contractor for resolution.
- Status tracking for each snag (e.g., Pending, In Progress, Completed).
This digital approach makes tracking, reporting, and ensuring quality much more streamlined.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to print (Opens in new window) Print
- Click to email a link to a friend (Opens in new window) Email
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on Threads (Opens in new window) Threads
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to share on Nextdoor (Opens in new window) Nextdoor