eAuditor Audits & Inspections

New Build Snagging List

New Build Snagging List in eAuditor Audits & Inspections helps identify issues that need to be addressed before the project is considered complete. Here’s a comprehensive snagging checklist for you to use, which can be customized in eAuditor Audits & Inspections for easy tracking and reporting.

New Build Snagging List

1. General Information

  • Property Address
  • Date of Inspection
  • Inspector’s Name
  • Developer/Contractor
  • Job Reference Number

2. Exterior Snagging

2.1. Roof

  • Tiles/slates/shingles: Check for missing, cracked, or misaligned roofing materials.
  • Gutters and downspouts: Ensure secure attaching with no blockages or leaks.
  • Roof flashing: Verify correct installation and sealing of flashing around chimneys, vents, and skylights.
  • Fascia and soffits: Inspect for damage, proper installation, and paint finishes.

2.2. Walls & Brickwork

  • Brickwork: Ensure brick/stone pointing is clean, consistent, and free from cracks.
  • Rendering: Check for smoothness, cracks, or any uneven finishes.
  • External paintwork: Inspect for any peeling, cracks, or incomplete areas.
  • Damp proof course (DPC): Confirm installation and visibility of DCP above ground level.

2.3. Windows & Doors (Exterior)

  • Windows: Check for cracks, scratches, or misaligned glazing. Verify seals and locks are functional.
  • External doors: Ensure doors open and close smoothly, with proper seals and alignment.
  • Paint/finish: Inspect for proper finish on window frames, doors, and surrounds.
  • Thresholds: Ensure external door thresholds are even and properly sealed.

2.4. Driveways, Paths, and Landscaping

  • Paving: Verify that paths, patios, and driveways are level, secure, and free from cracks.
  • Drains and gullies: Check for installation of external drains and they should be clear of debris.
  • Fencing and gates: Inspect for stability, damage, and proper installation.
  • Grass/turfing: Check for completion of landscaping and free from bare patches.

3. Interior Snagging

3.1. Walls & Ceilings

  • Paintwork: Inspect for uneven coverage, peeling, or paint splashes on fixtures.
  • Plaster: Ensure smoothness of walls and ceilings, with no cracks, bumps, or uneven finishes.
  • Corners and joints: Check that corners are smooth and joints are filled properly.
  • Drywall screws/nails: Look for any visible nail pops or screw marks.

3.2. Floors

  • Flooring (carpet, tile, wood, laminate): Check for level installation, no gaps, damage, or uneven surfaces.
  • Grouting: Ensure tiles are properly grouted with no cracks or gaps.
  • Skirting boards: Verify they are securely attached and free from gaps or poorly finished corners.

3.3. Doors & Windows (Interior)

  • Internal doors: Ensure doors are correctly aligned, open and close without sticking, and have no scratches or dents.
  • Door handles and locks: Check all handles and locks function smoothly without resistance.
  • Windows: Verify they open and close properly, with no sticking, and check for scratches on glass.
  • Window latches and seals: Ensure windows are properly sealed and latches work correctly.

3.4. Electrical Systems

  • Light switches: Ensure switches work correctly and are aligned with the wall.
  • Sockets: Check all sockets for function and ensure they are installed level with the wall.
  • Light fittings: Verify that all light fixtures are securely installed and bulbs are functioning.
  • Smoke detectors: Ensure smoke detectors are installed and functional.
  • External lights: Verify outdoor lighting is functional and properly positioned.

3.5. Plumbing Systems

  • Taps: Ensure all taps are working, with no leaks or drips.
  • Toilets: Verify toilets flush correctly and are securely fixed, with no leaks.
  • Sinks and basins: Ensure sinks are sealed properly, with no leaks or drainage issues.
  • Bath/shower: Check for leaks, ensure water pressure is adequate, and inspect seals around the bath or shower.
  • Radiators/heating: Verify radiators are heating properly, with no leaks or cold spots.

3.6. Kitchen & Utility

  • Cabinets and drawers: Check alignment, ensure doors and drawers open smoothly, and that handles are securely attached.
  • Countertops: Verify countertops are level, properly sealed, and free from scratches or damage.
  • Appliances: Ensure built-in appliances (oven, stove, dishwasher, etc.) are installed correctly and functional.
  • Plumbing: Check under-sink plumbing for leaks and correct installation.
  • Tiling and backsplash: Inspect for proper grout, tile alignment, and finishing around edges.

3.7. Bathrooms

  • Tiles: Inspect for cracked or uneven tiles, ensure grouting is complete and consistent.
  • Mirrors and cabinets: Ensure mirrors are securely installed, and cabinets function properly.
  • Shower doors: Verify shower doors open and close smoothly and are properly sealed to prevent leaks.
  • Towel rails and accessories: Check that all bathroom accessories are securely mounted.

3.8. Stairs and Balustrades

  • Handrails: Ensure handrails are secure, without any wobbling.
  • Steps: Check for level treads and ensure no creaking or loose steps.
  • Balustrades: Verify balustrades are securely fixed and correctly spaced according to building regulations.

New Build Snagging List


4. Heating and Ventilation

  • Thermostats: Ensure thermostats function correctly and control the heating system as expected.
  • Radiators: Check that radiators are heating properly, with no cold spots or leaks.
  • Air vents: Ensure all ventilation grilles are installed and functioning.
  • Extractor fans (kitchen and bathrooms): Verify extractor fans are working properly and are free from dust or obstructions.

5. Loft & Attic

  • Insulation: Ensure the attic is properly insulated, with no gaps or uneven installation.
  • Access hatch: Verify the hatch is secure, properly sealed, and easy to open/close.
  • Ventilation: Ensure adequate ventilation to prevent condensation or dampness.
  • Joists and beams: Check for any visible damage to joists or beams.

6. Final Checks

  • Cleanliness: Ensure all rooms are free from debris, dust, and construction materials.
  • Snagging completion: Mark each resolved snag as complete.
  • Additional notes: Provide any additional observations or areas that require further attention.

7. Photo Documentation

  • Take photos of any identified issues for documentation and tracking.
  • Provide before/after photos when snags are resolved.

8. Sign-Off

  • Inspector’s signature
  • Developer’s signature (if applicable)
  • Homeowner’s signature (if applicable)
  • Date of sign-off

Customization in eAuditor Audits & Inspections

New Build Snagging List

In eAuditor Audits & Inspections, you can customize this checklist by adding fields for:

  • Dropdown menus for specific room types or issue categories.
  • Photo uploads for each snag item.
  • Action assignments to ensure issues are assigned to the correct contractor for resolution.
  • Status tracking for each snag (e.g., Pending, In Progress, Completed).

This digital approach makes tracking, reporting, and ensuring quality much more streamlined.

 


Leave a Reply

Your email address will not be published. Required fields are marked *