Piping Pre-Commissioning Checklist
A Piping Pre-Commissioning Checklist helps ensure that all piping systems are properly prepared, tested, and ready for commissioning. Using a digital tool like eAuditor Audits & Inspections can streamline this process, allowing for easier documentation, tracking, and verification of tasks. Below is a detailed Piping Pre-Commissioning Checklist that can be implemented using eAuditor Audits & Inspections.
Piping Pre-Commissioning Checklist Template
General Information
- Project Name:
- Location:
- Piping System Type: (e.g., water, gas, oil, etc.)
- Inspector Name:
- Date:
- P&ID Drawing Number:
- System Identification Number:
- Pipe Material: (e.g., carbon steel, stainless steel, etc.)
1. Documentation Review
- P&ID Verified: Check that Piping & Instrumentation Diagrams (P&IDs) are current and match the physical piping layout.
- Isometric Drawings: Ensure to use approved isometric drawings and match the installed piping.
- Valve List Verified: Confirm all valves installed as per the approved valve list.
- Test Procedures Available: Verify that all necessary test procedures are available and approved.
2. Visual Inspection
- Piping Material Verification: Confirm the piping material matches project specifications.
- Flange Joints: Inspect flange joints for proper bolting, gasket installation, and cleanliness.
- Pipe Supports: Ensure the installation of all pipe supports is as per design and is free from defects.
- Weld Inspection: Verify the completion, inspection and documentation of all welds.
- Corrosion Protection: Confirm all piping and supports are coated or treated for corrosion prevention (where applicable).
- Cleanliness Check: Ensure the piping system is clean from debris, welding slag, and foreign objects.
- Insulation and Painting: Verify the completion of insulation and painting work.
3. Leak Testing (Hydrostatic / Pneumatic)
- Confirm Test Pressure: Ensure to calculate correct test pressure.
- Test Medium Confirmed: Confirm the medium to be used (e.g., water, air, nitrogen, etc.).
- Gauge Calibration: Verify the calibration of pressure gauges and valid certification.
- Test Witnessed: Check that all relevant parties are present to witness the test.
- Pressure Maintained: Ensure that the required pressure is maintained for the specified duration without leaks.
- Test Results Recorded: Document and store the results of the leak test.
- Ventilation Check (for Pneumatic): Ensure proper ventilation and safety measures are in place during pneumatic testing.
4. Flushing and Cleaning
- Flushing Plan in Place: Confirm the approval of flushing plan and alignment with the system requirements.
- Installation of Temporary Strainers : Verify the installation of temporary strainers for flushing (where applicable).
- Monitor Flow Rate : Ensure to monitor flow rate during flushing and make sure it is sufficient.
- Debris Removed: Confirm the removal of all debris from the system post-flushing.
- Maintain Flushing Records: Ensure to document all flushing activities and maintain all records.
5. Pressure Relief Devices
- Install Safety Valves: Ensure the installation of pressure relief valves or safety devices.
- Calibration Certificates: Verify that calibration certificates for all pressure relief devices are available.
- Set Points Verified: Confirm that set points for pressure relief valves match the system requirements.
6. Final System Integrity Checks
- Final Torqueing of Bolts: Confirm all bolts are torqued according to the approved torque specification.
- Valve Position Verification: Ensure all valves are in the correct operating position (open/close).
- Instrument Calibration: Verify that all connected instruments (pressure gauges, flow meters, etc.) are calibrated and functioning correctly.
- Piping Tagged: Confirm that all piping is tagged and labeled per project specifications.
- Completion of Punch List Items: Ensure all punch list items related to the piping system are completed and signed off.
7. Safety Checks
- Work Area Cleared: Verify that the work area is free from unnecessary equipment or obstructions.
- Lockout/Tagout Procedures Followed: Ensure to follow lockout/tagout procedures for system isolation during testing.
- Signage Installed: Check that all necessary safety and warning signs are installed.
8. Approvals and Sign-Offs
- Inspection Completed By:
- Inspector Signature:
- Client/Owner Representative Name:
- Client/Owner Signature:
- Date of Final Approval:
Using eAuditor Audits & Inspections for Piping Pre-Commissioning
- Create the Template: Input the checklist into eAuditor Audits & Inspections using the template builder. Customize fields to make them more interactive (e.g., yes/no checkboxes, photo capture, signature fields, etc.).
- Assign Inspections: Assign the checklist to appropriate team members or inspectors who will perform the pre-commissioning activities.
- Real-Time Reporting: With eAuditor Audits & Inspections, you can generate real-time reports, upload photos, and add notes directly from the app. This provides immediate feedback and documentation.
- Monitor Compliance: Track progress through eAuditor Audits & Inspection’s analytics to monitor the completion of tasks, identify outstanding issues, and ensure compliance with pre-commissioning protocols.
- Generate Reports: Export inspection reports in PDF format or share them digitally with stakeholders for final approval.
Customization Tips for eAuditor Audits & Inspections
- Use eAuditor Audits & Inspections’ photo capture feature for visual documentation (e.g., capturing welds, installations).
- Set up alerts and reminders for critical tasks or inspections.
- Integrate with other tools for automated report distribution or data storage.
This comprehensive checklist ensures that all essential pre-commissioning tasks are completed, with eAuditor Audits & Inspections adding efficiency and traceability to the process.