Residential Plumbing Rough-In Inspection Checklist
Creating a “Residential Plumbing Rough-In Inspection Checklist” in eAuditor Audits & Inspections (or any digital inspection tool) involves breaking down the key aspects of plumbing rough-in based on local building codes, safety standards, and best practices. Below is a detailed checklist for a residential plumbing rough-in inspection that can be used in eAuditor Audits & Inspections:
Residential Plumbing Rough-In Inspection Checklist
1. General Information
- Inspector Name:
- Inspection Date:
- Project Address:
- Permit Number:
- Contractor/Plumber:
- Weather Conditions:
- Job Number:
2. Plumbing Rough-In Overview
- Has the rough-in work been completed according to the approved plans?
☐ Yes ☐ No ☐ N/A - Are the correct pipe materials used for each system (water, waste, vent)?
☐ Yes ☐ No ☐ N/A - Is the plumbing system installed according to local building codes?
☐ Yes ☐ No ☐ N/A - Are all pipes properly labeled (hot/cold, drain, vent, etc.)?
☐ Yes ☐ No ☐ N/A
3. Water Supply Lines
- Are water supply lines installed in the correct locations?
☐ Yes ☐ No ☐ N/A - Are pipes adequately supported at intervals specified by code?
☐ Yes ☐ No ☐ N/A - Are water lines properly insulated where required?
☐ Yes ☐ No ☐ N/A - Is the correct pipe size used for water supply (main, branch lines, fixtures)?
☐ Yes ☐ No ☐ N/A - Is the pressure test of water supply lines completed and passed?
☐ Yes ☐ No ☐ N/A - Are shut-off valves installed in accessible locations?
☐ Yes ☐ No ☐ N/A
4. Drainage and Waste Lines
- Are waste and drain lines installed according to plans?
☐ Yes ☐ No ☐ N/A - Are pipes correctly sloped (typically 1/4 inch per foot for horizontal runs)?
☐ Yes ☐ No ☐ N/A - Are the correct pipe sizes used for each drain line (toilets, sinks, showers, etc.)?
☐ Yes ☐ No ☐ N/A - Are traps and vents properly installed?
☐ Yes ☐ No ☐ N/A - Is a leak test (water or air) of waste and drain lines completed?
☐ Yes ☐ No ☐ N/A - Are cleanouts installed in accessible locations per code requirements?
☐ Yes ☐ No ☐ N/A
5. Venting System
- Are vent pipes installed according to code (stack vents, branch vents)?
☐ Yes ☐ No ☐ N/A - Are vents sized correctly based on fixture unit load?
☐ Yes ☐ No ☐ N/A - Are vent pipes properly supported and spaced?
☐ Yes ☐ No ☐ N/A - Is the venting system free from obstructions and blockages?
☐ Yes ☐ No ☐ N/A
6. Fixture Placement & Mounting
- Are the locations of all fixtures (sinks, toilets, tubs, etc.) marked according to plans?
☐ Yes ☐ No ☐ N/A - Are the rough-in measurements for fixture drains and water lines correct?
☐ Yes ☐ No ☐ N/A - Are pipe stubs in correct positions for future fixture connections?
☐ Yes ☐ No ☐ N/A - Are water lines for each fixture type (hot and cold) positioned properly?
☐ Yes ☐ No ☐ N/A
7. Gas Lines (If Applicable)
- Are gas lines installed according to the plan and local codes?
☐ Yes ☐ No ☐ N/A - Is the gas pipe material appropriate for the system?
☐ Yes ☐ No ☐ N/A - Are shut-off valves installed and accessible?
☐ Yes ☐ No ☐ N/A - Has a pressure/leak test been performed on gas lines?
☐ Yes ☐ No ☐ N/A
8. Water Heater Rough-In (If Applicable)
- Is the water heater location roughed-in according to plans?
☐ Yes ☐ No ☐ N/A - Are the necessary hot and cold water lines run to the unit location?
☐ Yes ☐ No ☐ N/A - Is the venting (if gas) or electrical supply (if electric) prepared?
☐ Yes ☐ No ☐ N/A
9. Code Compliance
- Is the rough-in inspection ready for local building department inspection?
☐ Yes ☐ No ☐ N/A - Are any code violations or issues identified?
☐ Yes ☐ No ☐ N/A - Comments on any code violations (describe issues and recommended corrections):
10. Additional Notes & Comments
- Notes or comments on inspection findings: ☐ Yes ☐ No ☐ N/A
11. Inspection Sign-Off
- Inspector Signature:
- Date:
- Contractor/Plumber Signature:
- Date:
How to Use in eAuditor Audits & Inspections
- Create a New Template: Open eAuditor Audits & Inspections, go to “Templates,” and click “Create New Template.”
- Add Checklist Sections: Break the form into sections like “General Information,” “Water Supply Lines,” etc.
- Input Fields: Use text fields, checkboxes, dropdowns, or signature fields where needed.
- Attachments: Optionally, allow photo documentation for sections where visual verification is needed.
- Scoring (Optional): If required, assign pass/fail or numerical scores to individual sections for overall inspection grading.
This checklist ensures that all critical areas of a plumbing rough-in are checked, and using it in eAuditor Audits & Inspections helps ensure a thorough, standardized inspection process.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to print (Opens in new window) Print
- Click to email a link to a friend (Opens in new window) Email
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on Threads (Opens in new window) Threads
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to share on Nextdoor (Opens in new window) Nextdoor