Building Handover Inspection Checklist
For a Building Handover Inspection Checklist using eAuditor Audits & Inspections, you can include comprehensive sections that cover various aspects of the building, from structural integrity to mechanical, electrical, and safety systems. Here’s an outline to help you create a thorough checklist:
1. General Information
- Inspector’s Name: [Text Input]
- Date of Inspection: [Date Picker]
- Building Address: [Text Input]
- Building Owner/Client Name: [Text Input]
- Project/Building Description: [Text Input]
- Project Number: [Text Input]
- Weather Conditions: [Dropdown or Text Input]
- Contractor Name: [Text Input]
- Inspection Type: [Pre-Handover/Final Handover]
2. External Areas
- Site Condition
- Site is clean and free of construction debris: [Yes/No]
- No visible damage to surrounding landscaping: [Yes/No]
- Drainage systems are functioning properly: [Yes/No]
- Building Exterior
- No visible cracks, damage, or signs of deterioration on exterior walls: [Yes/No]
- Paintwork or cladding in good condition: [Yes/No]
- Windows and doors close and seal correctly: [Yes/No]
- Roofing appears free from damage or leaks: [Yes/No]
- Guttering and downpipes are secure and functional: [Yes/No]
3. Interior Areas
- General Interior Condition
- Walls, floors, and ceilings are free from cracks, damage, or stains: [Yes/No]
- Paintwork is complete and in good condition: [Yes/No]
- Windows and doors function properly and have correct hardware: [Yes/No]
- Floors are level and free from damage: [Yes/No]
- Ceilings have no visible water damage or cracks: [Yes/No]
- Final cleaning completed: [Yes/No]
- Stairways and Hallways
- Handrails are secure and stair treads in good condition: [Yes/No]
- Hallways and stairways are clear and safe for use: [Yes/No]
4. Mechanical Systems (HVAC, Plumbing, etc.)
- Heating, Ventilation, and Air Conditioning (HVAC)
- HVAC systems tested and operational: [Yes/No]
- Thermostats function correctly: [Yes/No]
- No unusual noises during operation: [Yes/No]
- Ducts and vents are properly sealed: [Yes/No]
- Plumbing
- Water supply system operational: [Yes/No]
- Hot water system operational: [Yes/No]
- No visible leaks in water pipes: [Yes/No]
- Fixtures (sinks, toilets, showers) operate correctly: [Yes/No]
- Drainage system tested and functioning: [Yes/No]
- Fire Suppression Systems
- Sprinklers installed and tested: [Yes/No]
- Fire extinguishers in place and certified: [Yes/No]
- Smoke detectors tested and operational: [Yes/No]
- Fire exits and emergency lighting functional: [Yes/No]
5. Electrical Systems
- Main Electrical Supply
- Electrical panel accessible and labeled: [Yes/No]
- No signs of overheating, corrosion, or damage in panels: [Yes/No]
- Circuit breakers tested: [Yes/No]
- Electrical Fixtures
- All lights, outlets, and switches function correctly: [Yes/No]
- GFCI outlets installed where required: [Yes/No]
- Smoke detectors wired and operational: [Yes/No]
- Emergency Systems
- Emergency lighting functional: [Yes/No]
- Backup power systems tested: [Yes/No]
- Fire alarm systems tested: [Yes/No]
6. Safety and Compliance
- Fire Safety
- Fire doors close and latch properly: [Yes/No]
- Escape routes clear and marked: [Yes/No]
- Fire extinguishers installed and tested: [Yes/No]
- Occupational Safety
- Handrails and balustrades secure: [Yes/No]
- Ladders, scaffolding, or other temporary structures removed: [Yes/No]
- Access Control and Security
- All locks and security systems operational: [Yes/No]
- CCTV and alarm systems installed and tested: [Yes/No]
7. Utilities
- Water Supply
- Mains water connection is operational: [Yes/No]
- Meter reading recorded: [Yes/No]
- Gas Supply
- Â connected and tested Gas supply: [Yes/No]
- Gas shut-off valve accessible: [Yes/No]
- Meter reading recorded: [Yes/No]
- Electricity
- Power connection established: [Yes/No]
- Meter reading recorded: [Yes/No]
8. Documentation and Handover
- As-built Drawings and Manuals
- As-built drawings provided: [Yes/No]
- Equipment operating manuals provided: [Yes/No]
- Maintenance schedule provided: [Yes/No]
- Warranties
- Warranties and guarantees for equipment and materials provided: [Yes/No]
- Certificates and Approvals
- All regulatory approvals and certificates obtained (electrical, plumbing, etc.): [Yes/No]
- Occupancy certificate issued: [Yes/No]
9. Final Walkthrough and Sign-Off
- Defects and Snagging Items
- All defects and snagging items recorded and addressed: [Yes/No]
- Outstanding work listed and signed off by contractor: [Yes/No]
- Handover Completed
- Final inspection completed: [Yes/No]
- Client satisfied with the condition of the building: [Yes/No]
- Comments/Notes: [Text Input]
- Photos of Defects or Key Areas: [Image Upload]
10. Inspector and Client Signatures
- Inspector Signature: [Signature Field]
- Client Signature: [Signature Field]
Customization in eAuditor Audits & Inspections
You can configure this checklist in eAuditor Audits & Inspections by adding custom responses (e.g., dropdown lists, checkboxes), photo upload fields for documenting defects, and automated notifications for follow-up tasks or recurring inspections.
This template ensures a detailed assessment of all building components, ensuring a smooth handover process for both the contractor and the client.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to print (Opens in new window) Print
- Click to email a link to a friend (Opens in new window) Email
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on Threads (Opens in new window) Threads
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to share on Nextdoor (Opens in new window) Nextdoor